Commissioning: Value Engineering in the 11th Hour

Challenge

Engaged by a developer to commission a new high-rise residential building, C3 was enlisted early in the process to add our experience in MEP systems design and operations to ensure the most practical and cost-effective design.

Solution

The C3 team worked closely with the developer, MEP and LEED consultants, and the general contractor early in the process to expedite the design and value engineer it before the 11th hour when construction was to begin.

Result

Working as part of a collaborative team, C3 helped lead the way to a practical design at the most cost-effective price. Our intimate involvement throughout the process allowed for a seamless commissioning experience and transition to the operations staff.