Challenge

Our client needed a fast-track design for a new 500,000-square-foot, mission-critical office building. The project required careful coordination with the needs of the building owner, the contractor and the single building tenant.

Solution

C3 provided full MEP/FP design and commissioning services. Our team worked closely with the general contractor and pre-selected MEP/FP contractors to enable rapid ordering of major equipment, avoiding delays. We also coordinated infrastructure installation with the structural engineer and architect before final construction plans were complete.

Result

By facilitating a successful collaboration, C3 helped advance the construction to meet the tight schedule, while still providing high-quality design and functional systems. Our Commissioning team and LEED Consulting group oversaw the validation and LEED certification of the entire project, ensuring strategic objectives were met.

Contact Us

How can we help you?

Explore how C3 can add value to your project.

Contact us